SNG(Synthetic Natural Gas) Production Plant
Price: 60 000 000$ as is where is brokers must add
Cost for dismantling loading onto containers and local transportation will be calculated upon receipt of LOI with POF
FOB price will be available only with LOI and POF
The loading port is Busan and Masan port
Please find details on this plant as attached
SNG(Synthetic Natural Gas) Production Plant
Commissioning year: 2014
Production capacity: 500,000ton/year(0.7 B NM3/year)
Coal Consumption: 2 Million ton/year
Area: Approx. 400 000m2
Design and Make: ConocoPhillips(U.S.A)
Haldor Topsoe (Denmark)
Linde (Germany)
Licensor:
CB&I (Gasification) ConocoPhillips(E-Gas™ Technology)(U.S.A)
Linde (AGR)( Gas Treatment Contractor)(Germany)
Haldor Topsoe (Methanation)(Denmark)
Front End Engineering Design (FEED) Contractor: Jacobs
• 5500mt/day sub-bituminous coal processed into syngas and catalytically converted to methane.
• 2 + 1 Gasification Trains
• Feedstock: 5 500 tpd sub-bituminous coal, up to 20% petcoke blend
(Process)
Coal-Gasification of coal-Heat recovery-Dust collection-Water Gas Production-Desulfurization/Separation of CO2-SNG Synthetic –Drying/Compressing-SNG Product
(Features)
• Methane production in 2ndstage results in smaller shift, AGR & methanationunits
• HP steam coupled with process heat from methanation enhances thermal efficiency
• Long operating experience with petroleum coke and sub bituminous coal at world scale
• Low start-up emissions
• Higher capacity trains
• Lower carbon slag product
• Leverages KY NewGasdesign experience.
• E-Gas™ Technology enhancements improve SNG project econo
• Builds on lengthy E-Gas™ operating experience processing.
petcoke, sub-bituminous coal and bituminous coal.
If you are interested in buying this stock offer or you have any questions feel free to contact us.